PPAP — Production Part Approval Process

Organise evidence that engineering design and specification requirements can be met under actual production conditions.

When to use it

Organise evidence that engineering design and specification requirements can be met under actual production conditions.

QAPP principle

The application structures the workflow, evidence, ownership and links. Engineering judgement and customer-specific requirements remain with the competent team.

Inputs and preparation

Workflow

  1. Confirm the customer-agreed submission level and requirements.
  2. Control document versions and the source of each piece of evidence.
  3. Verify that results come from a representative production process.
  4. Manage gaps and deviations before submission.
  5. Retain approval status and history.

How QAPP can digitise it

ElementDigital implementation
DataStructured fields, controlled lists, revisions and attached evidence.
OwnershipOwners, due dates, notifications, approvals and escalation.
TraceabilityLinks between records, actions, revisions and resulting evidence.
ReviewStatus, open risks, overdue actions and management dashboards.

AIAG alignment

Interpretation limits

This page is practical guidance, not a replacement for the licensed AIAG publication, IATF/customer-specific requirements or competent engineering judgement.