QAPP / QUALITY
AIAG Control Plan · 1st Edition

Control Plan — controls, reaction and Safe Launch

Turn product/process characteristics and risks into executable checks with method, sampling, frequency and reaction plan.

What problem it solves

Turn product/process characteristics and risks into executable checks with method, sampling, frequency and reaction plan.

Connected system

QAPP links the method with ownership, evidence, actions and upstream/downstream quality records.

Inputs

Method flow

  1. Link each control to the process and risk it addresses.
  2. Define the control method and measurement system.
  3. Set sample size and frequency.
  4. Define reaction before the deviation occurs.
  5. Review the plan when the process, risk or lessons learned change.

QAPP implementation

NeedQAPP implementation
StructureControlled fields, revisions, linked records and required evidence.
ActionsOwner, due date, approval, escalation and effectiveness verification.
TraceabilityHistory of changes and links to related Quality / CI / Analytics records.

AIAG alignment

Common mistakes

Do not treat the digital form as proof that the method was applied correctly. The method requires competent analysis, representative evidence and customer-specific requirements where applicable.